Instaappointment Image
Instaappointment image

Current Opening

Home  /  Current Opening

Manager Heat Treatment

Experience – 11 to 15 years

Should have previous experience in:

  • Leadership qualities to lead the section. Sound knowledge of furnace & process Design/ Controls
  • Sound knowledge of different grades of raw material & surface treatment processes.
  • Sound knowledge of various heat treatment processes like Case, induction, vacuum hardening, etc.
  • Sound knowledge/ hands on experience of metallurgical lab related activities. Must be familiar with QMS, EMS, CQI 9, various national/ International standards.
  • Should be familiar with production planning, shop floor management to have maximum utilization.
  • Should be familiar with furnace capacity calculation, process cost calculation & monitoring, time study, MIS, etc. Sound knowledge of heat treatment fixture- Designing & management

Must be familiar with various quality tools (4M, 7 steps, etc), FMEA, Control plan, continual improvement, loss identification, data analysis, waste management, 5S, Kaizen, etc.

Manager – Lean Mfg.

Qualification : B.E. / B.Tech (Mechanical or Industrial Engineering)

  1. Man, machine requirement analysis for different processes in manufacturing. 
  2. Line balancing as per the product & process.
  3. Resolving bottlenecks by method improvement & reducing work contents.
  4. Time study and work content measurement for the manufacturing operations.
  5. Carrying continuous improvement activities on the production floor.
  6. Preparation of Improvement project budgeting.
  7. Preparation of redesigning of lean layout with adequate Material Handling Equipment (MHE)
  8. Material Logistic inhouse for smooth material handling
  9. Inventory Control with lean
  10. Hands on experience in Implementation & Co-ordination of Lean, VSM, 5S, TQM, Six Sigma projects, Monitor Ergonomics, Re-engineering concepts, Capacity planning and Productivity Improvement
  11. Plant Layout & Plant Material Handling system improvement
  12. Implementation of KANBAN.
  13. Method Study, Time study and MOST implementation
  14. Standardization of Process & Define Production Norms for multi-machine and multi-operation
  15. Hands on experience in system designing & Incentive schemes.
  16. Plant Capacity Planning & Capacity Calculation, Identify Facility, Procurement of facility and Installation and streamline
  17. Productivity Measurement Analysis and Improvement, Prepare Training Module work skill development.